Eiffage Énergie Systèmes - Guyane
Eiffage Énergie Systèmes - Guyane holds 8 public contracts awarded by Guyane between 2020 and 2026. That is 2% of the value of the contracts the authority awarded over the period.
head office in Cayenne (973) · 50 to 99 employees · Travaux d'installation électrique dans tous locaux · SIREN 518137823
Its contracts in Guyane
Maximum amount of each contract, over its whole term: not what was paid.
Trx achèvement courant fort et faible lycée macouria bâtiment internat…2026 · maximum over 2 years · at most ~€83k a year on average · Contract awarded without prior advertising or competitive bidding€166kTravaux d’installation des bungalows A au lycée Melkior…2026 · maximum over 2 months · Simplified procedure€164kRemplacement du Système de Sécurité Incendie du PROGT…2026 · maximum over 4 months · Simplified procedure€91kConstruction COLL ecoquartier RMY2022 · maximum over 22 months · at most ~€996k a year on average · Simplified procedure€1.8MConstruction COLL ecoquartier RMY2022 · maximum over 22 months · at most ~€535k a year on average · Simplified procedure€981kSee the 3 other contracts
Construction du Lycée de MaripasoulaÉlectricité · 2021 · maximum over 3 years · at most ~€1.8M a year on average · Open tender€5.1MConstruction cité scolaire st-georges2020 · maximum over 2 years · at most ~€1.9M a year on average · Open tender€3.8MConstruction cité scolaire st-georges2020 · maximum over 2 years · at most ~€1.1M a year on average · Open tender€2.2MYear by year
€€6M in 2020 · €€421k in 2026
Click a year to see its amount.
In towns
Eiffage Énergie Systèmes - Guyane holds contracts in 2 towns, worth €1.7M at award.