Public contracts of Guyane · 2021

Construction du lycee 4 de Saint-Laurentdu Maroni

€14.8M
maximum contract amount over 2.5 years — what was paid on it is not published
Signed on 20 December 2021 · ended around August 2024 · 2.5 yrs

That is at most ~€5.5M a year on average: a maximum too.

Company selected

NofrayaneSIREN 334343738

A contract awarded to a consortium of 3 holders; above, the main holder. With it: Cie Guyanaise d'Inter Travaux, Art'BAT. The amount is the whole contract’s: the DECP does not publish each holder’s share.

The largest of the 28 contracts Guyane published for 2021.

Other contracts of Nofrayane in Guyane

Construction du Lycée de Maripasoula2023 · maximum over 3 years3.4€MConstruction du Lycée de Maripasoula2021 · maximum over 2.5 years3.6€MConstruction du lycée maripasoula2020 · maximum over 3 years43.3€M
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Mixte

Published amendments : 8

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.