Skip to main content

Public contracts of Guyane · 2021

Extension du collège arsene bouyer d’angoma à saint laurent

€1.1M
maximum contract amount over 3.5 years — what was paid on it is not published
Signed on 27 January 2021 · ended around July 2024 · 3.5 yrs

That is at most ~€318k a year on average: a maximum too.

Who won it

Guyane Technique Infrastructure SARLIngénierie, études techniques · registered office Remire-Montjoly (97354) · headcount 10 to 19 employees · SIREN 351579636

A contract awarded to a consortium of 6 holders; above, the main holder. With it: Concept Elec, Société d'Études Specialisee en Ingenierie de la Construction, Atelier Jade. The amount is the whole contract’s: the DECP does not publish each holder’s share.

Number 12 by amount of the 28 contracts Guyane published for 2021.

Other contracts of Guyane Technique Infrastructure SARL in Guyane

Maîtrise d’œuvre pour la réalisation de 21 bureaux en type modulaire…2026 · maximum over 3 years143€kMaîtrise d’œuvre pour la réalisation de 21 bureaux en type modulaire…2026 · maximum over 3 years127€kÉtudes de définition portant sur la mise hors-d’eau de la section de la…2023 · maximum over 10 months332€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Mixte

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.