Skip to main content

Public contracts of Guyane · 2025

Réhabilitation et construction du lyceee melkior Garre-phase 1-a

Dépose démolition gros oeuvre

€3.9M
maximum contract amount over 2 years — what was paid on it is not published
Signed on 7 April 2025 · running until about April 2027 · 2 yrs
Ongoing8 Apr 2027

That is at most ~€1.9M a year on average: a maximum too.

Who won it

Soc SefitecTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Remire-Montjoly (97354) · headcount 50 to 99 employees · SIREN 378304570

Number 4 by amount of the 224 contracts Guyane published for 2025.

Other contracts of Soc Sefitec in Guyane

Construction du lycée polyvalent de Macouria2022 · maximum over 2.5 years14€MConstruction COLL ecoquartier RMY2022 · maximum over 22 months13.5€MTravaux de construction de la Cité Scolaire de Saint€eorges de l’Oyapock2020 · maximum over 2 years18.4€M
Contract details (procedure, price, amendments, lots)

Procedure : Appel d'offres ouvert

Price : Forfaitaire

Published amendments : 2

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.