Construction du centre aquatique : électricité

€522k
maximum contract amount over 6 months — what was paid on it is not published
Signed on 16 December 2019 · ended around June 2020 · 6 months

Who won it

SARL P.P.S.Travaux d'installation électrique dans tous locaux · registered office Bollene (84500) · headcount 20 to 49 employees · SIREN 444894943

Number 7 by amount of the 28 contracts Saint-Paul-Trois-Châteaux published for 2019.

Other contracts of SARL P.P.S. in Saint-Paul-Trois-Châteaux

Travaux maison de santé pluriprofessionnelle2024 · maximum over 9 months112€kTravaux de rénovation et extension du musée d’archéologie Tricastine2024 · maximum over 14 months90€kRéfection de l’éclairage de la Cathédrale2024 · maximum over 1 month12€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : 1

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.