Public contracts of Saint-Sébastien-sur-Loire · 2021 · Energy
Travaux pour l’extension de l’école maternelle du centre
Électricité courants forts et faibles
That is at most ~€48k a year on average: a maximum too.
Company selected
Ceco ElecTravaux d'installation électrique dans tous locaux · registered office Reze (44400) · headcount 1 or 2 employees · SIREN 412662314Number 25 by amount of the 65 contracts Saint-Sébastien-sur-Loire published for 2021. It belongs to the policy Schools.
Other contracts of Ceco Elec in Saint-Sébastien-sur-Loire
Construction de locaux de stockage associatifs2020 · maximum over 10 months2€kTravaux de réfection et réaménagement du manoir de la Tullaye2019 · maximum over 6 months8€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Révisable
Published amendments : none
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.