Travaux pour la création d’une maison de santé dans des locaux désaffectés de l’hôpital de Sisteron

Cloisons · Doublages · Faux plafond

€60k
maximum contract amount over 8 months — what was paid on it is not published
Signed on 22 September 2021 · ended around May 2022 · 8 months

Company selected

AibTravaux de peinture et vitrerie · registered office Sisteron (04200) · headcount 10 to 19 employees · SIREN 794238212

Number 30 by amount of the 50 contracts Sisteron published for 2021. It belongs to the policy Health and social care.

Other contracts of Aib in Sisteron

Aménagement intérieur du cinéma de Sisteron2026 · maximum over 3 months11€kAlcazar : cloisons et doublages2024 · maximum over 17 months321€kConstruction du nouvel alcazar:-6a2024 · maximum over 15 months270€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.