Public contracts of Talmont-Saint-Hilaire · 2022 · Construction and buildings
Réalisation de travaux d’isolation, de toiture et de bardage pour la salle de sports Les Minées
Talmont-Saint-Hilaire · Gros œuvre Démolition
That is at most ~€41k a year on average: a maximum too.
Company selected
SARL Beignon Andre GuyTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Talmont-Saint-Hilaire (85440) · headcount 6 to 9 employees · SIREN 481468452Number 43 by amount of the 60 contracts Talmont-Saint-Hilaire published for 2022. It belongs to the policy Culture, sport and youth.
Other contracts of SARL Beignon Andre Guy in Talmont-Saint-Hilaire
Gros œuvre2022 · maximum over 5 months63€kContract details (procedure, price, amendments, lots)
Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds
Price : Ferme et actualisable
Published amendments : none
Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.