Supplier of Villeneuve-Tolosane · Construction and buildings
Eco et Avenir Bois
Eco et Avenir Bois holds 5 public contracts awarded by Villeneuve-Tolosane between 2024 and 2026. That is 1% of the value of the contracts the town awarded over the period.
head office in Carbonne (31) · 10 to 19 employees · Travaux de charpente · SIREN 807655295
Its contracts in Villeneuve-Tolosane
Maximum amount of each contract, over its whole term: not what was paid.
Charpente / couverture / bardage2026 · maximum over 6 months · Simplified procedure€67kTravaux de création du Centre Social à la Maison pour tous2026 · maximum over 5 months · Simplified procedure€67kRénovation de la Maison Leyrisse2024 · maximum over 11 months · 2 lots · Simplified procedure€107kOssature boisCharpente · Couverture · Zinguerie · Terrasse bois · 2024 · maximum over 16 months · at most ~€75k a year on average · Simplified procedure€100kYear by year
Regions, départements, intercommunalities
Eco et Avenir Bois holds contracts awarded by 9 of these bodies, worth €1.3M.
See the 9 bodies
Communauté d'agglomération Gaillac-GraulhetIntercommunality · 3 contracts€304kCommunauté de communes des Deux RivesIntercommunality · 4 contracts€280kCommunauté de communes Le Grand Ouest ToulousainIntercommunality · 2 contracts€229kCommunauté de communes des Coteaux du GirouIntercommunality · 1 contract€143kCommunauté de communes des Coteaux Arrats GimoneIntercommunality · 1 contract€120kCommunauté d'agglomération Le Muretain AggloIntercommunality · 1 contract€82kTarn-et-GaronneDépartement · 1 contract€57kAriègeDépartement · 1 contract€53kToulouse MétropoleIntercommunality · 1 contract€35kElsewhere in France
Eco et Avenir Bois holds contracts in 33 towns, worth €5M at award.