Animal Care and Control Facility (civic building, run by the City Administrator): $287.7M budgeted for its department in FY2025, 1,154 employees on the payroll, 4 city documents at the Internet Archive, every figure linked to its source. The city's animal shelter appears in San Francisco's capital documents as a problem to be solved. The 2016 Capital Plan describes the then-current shelter at 1200 15th Street as a seismically vulnerable building constructed in 1931, and lists a $49 million Animal Care and Control Facility Renovation and Seismic Retrofit among its earthquake and safety improvements; the adopted five-year financial plan folds the same work into a public health and safety bond alongside seismic strengthening at San Francisco General. The financing then changed shape. The mayor's proposed budget counts a replacement facility among the projects carried by Certificates of Participation, which the plan reserves for projects with a revenue source or critical seismic work, and on 29 November 2016 the Board of Supervisors authorized certificates of up to $60,500,000 to finance the acquisition, construction and improvement of an animal care and control facility. What was built shows on the parcel at 1419 Bryant Street: a $26.5 million permit, now complete, to convert a former transit-agency building — two new storeys inside the existing brick envelope, with new structural support — followed by a $2.9 million build-out of unoccupied third-floor shell space issued in 2025. Source: SF Controller open data and the Internet Archive.

Animal Care and Control Facilityassets1.cbsnewsstatic.com · Bing · UNVERIFIED
Grounded summary

The city's animal shelter appears in San Francisco's capital documents as a problem to be solved. The 2016 Capital Plan describes the then-current shelter at 1200 15th Street as a seismically vulnerable building constructed in 1931, and lists a $49 million Animal Care and Control Facility Renovation and Seismic Retrofit among its earthquake and safety improvements; the adopted five-year financial plan folds the same work into a public health and safety bond alongside seismic strengthening at San Francisco General. The financing then changed shape. The mayor's proposed budget counts a replacement facility among the projects carried by Certificates of Participation, which the plan reserves for projects with a revenue source or critical seismic work, and on 29 November 2016 the Board of Supervisors authorized certificates of up to $60,500,000 to finance the acquisition, construction and improvement of an animal care and control facility. What was built shows on the parcel at 1419 Bryant Street: a $26.5 million permit, now complete, to convert a former transit-agency building — two new storeys inside the existing brick envelope, with new structural support — followed by a $2.9 million build-out of unoccupied third-floor shell space issued in 2025.

Built from: 4 archive documents, city budget data — no outside knowledge added.

Archive coverage for this place is limited — only 4 matched documents so far, so this summary stays short rather than padded.

1419 Bryant St · City-owned · 94,963 sq ft · parcel 3904002 · District 9 · City Facilities registry

What public money did here

No city spending is recorded against this place by name. San Francisco publishes contracts, bond items and vendor payments at project level, and none of them names this site — so there is no figure to show, rather than a figure of zero.

Run by the City Administrator, whose whole-department budget is $287.7M across 1,154 staff (FY2025) — citywide, not this place’s own. The City does not publish a running cost per building.

In the archive

1 procedural record — minutes, agendas, calendars — not listed.

Same kind