Skip to main content

Public contracts of Bordeaux Métropole · 2020

Assistance à maîtrise d’ouvrage

Diagnostic des ouvrages de protection contre les inondations fluvio-maritimes de Bègles

€36k
maximum contract amount over 3 months — what was paid on it is not published
Signed on 4 August 2020 · ended around November 2020 · 3 months

Who won it

Setec HydratecIngénierie, études techniques · registered office Paris (75012) · headcount 200 to 249 employees · SIREN 301392569

The competition

4 bids received

awarded to 1 company

Open data publishes the winner and the bid count — never the identity of unsuccessful bidders.

Number 244 by amount of the 279 contracts Bordeaux Métropole published for 2020.

Other contracts of Setec Hydratec in Bordeaux Métropole

Maîtrise d’oeuvre pour les travaux sur les ouvrages de protection…2025 · maximum over 5 years870€kAssistance à maîtrise d’ouvrage pour la réalisation d’études…2023 · maximum over 12 months2.8€MMaîtrise d’œuvre travaux sur les ouvrages de protection contre les…2021 · maximum over 4 years1.6€M
Contract details (procedure, price, amendments, lots)

Price : Forfaitaire

Published amendments : none

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.