Supplier of Communauté de communes de la Vallée de la Doller et du Soultzbach
Roesch Constructions
Roesch Constructions holds 5 public contracts awarded by Communauté de communes de la Vallée de la Doller et du Soultzbach between 2022 and 2024. That is 10% of the value of the contracts the intercommunality awarded over the period.
head office in Heimsbrunn (68) · 20 to 49 employees · Travaux de maçonnerie générale et gros œuvre de bâtiment · SIREN 348563289
What Roesch Constructions does in Communauté de communes de la Vallée de la Doller et du Soultzbach
Maximum amount of each contract, over its whole term: not what was paid.
Restructuration de la piscine de masevaux-niederbruckTerrassement · Gros oeuvre · 2024 · maximum over 13 months · at most ~€339k a year on average · Simplified procedure€368kTravaux de restructuration de la piscine intercommunale de…Terrassement / Gros oeuvre · 2024 · maximum over 13 months · at most ~€339k a year on average · Simplified procedure€368kPériscolaire de burnhaupt-le-basGros oeuvre · 2022 · maximum over 16 months · at most ~€217k a year on average · Simplified procedure€289kConstruction d’un accueil périscolaire à Burnhaupt-le-BasLot -2 : GROS-ŒUVRE · 2022 · maximum over 16 months · at most ~€217k a year on average · Simplified procedure€289kPériscolaire de burnhaupt-le-basGros oeuvre · Correctif · 2022 · maximum over 16 months · at most ~€214k a year on average · Simplified procedure€286kRegions, départements, intercommunalities
Roesch Constructions also holds contracts awarded by 4 other bodies, worth €3.2M.
In towns
Roesch Constructions holds contracts in 4 towns, worth €1.2M at award.