Public contracts of Communauté de communes de la Vallée de la Doller et du Soultzbach · 2022

Construction d’un accueil périscolaire à Burnhaupt-le-Bas

Lot -2 : GROS-ŒUVRE

€289k
maximum contract amount over 16 months — what was paid on it is not published
Signed on 14 November 2022 · ended around March 2024 · 16 months

That is at most ~€217k a year on average: a maximum too.

Who won it

Roesch ConstructionsTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Heimsbrunn (68990) · headcount 20 to 49 employees · SIREN 348563289

Number 6 by amount of the 38 contracts Communauté de communes de la Vallée de la Doller et du Soultzbach published for 2022.

Other contracts of Roesch Constructions in Communauté de communes de la Vallée de la Doller et du Soultzbach

Restructuration de la piscine de masevaux-niederbruck2024 · maximum over 13 months368€kTravaux de restructuration de la piscine intercommunale de…2024 · maximum over 13 months368€kPériscolaire de burnhaupt-le-bas2022 · maximum over 16 months289€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Révisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.