Skip to main content

Public contracts of Montpellier Méditerranée Métropole · 2024

Travaux de construction du bâtiment annexe de l’Ecolothèque

€116k
maximum contract amount over 13 months — what was paid on it is not published
Signed on 20 December 2024 · ended around January 2026 · 13 months

That is at most ~€107k a year on average: a maximum too.

Who won it

Le MarcoryTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Clermont-L'Herault (34800) · headcount 50 to 99 employees · SIREN 319607156

A contract awarded to 2 holders; above, the main holder. With it: Eurovia Languedoc Roussillon (Joulie TP). The amount is the whole contract’s: the DECP does not publish each holder’s share.

The competition

3 bids received

Median for this procedure in 2024: 3 bids, across 48385 comparable contracts. Simplified procedure · awarded to 2 companies

Open data publishes the winner and the bid count — never the identity of unsuccessful bidders.

Number 177 by amount of the 254 contracts Montpellier Méditerranée Métropole published for 2024.

Other contracts of Le Marcory in Montpellier Méditerranée Métropole

Ecolotheque travaux de construction du bâtiment annexe de l’ecolotheque2024 · maximum over 15 months116€kTrx mur de soutènement restinclieres2022 · maximum over 3 months90€kConstruction d’un poste de refoulement des eaux usées…2021 · maximum over 10 months458€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Forfaitaire

Published amendments : 2

Subcontracting declared : no

Social considerations : Critère social

Environmental considerations : Critère environnemental, Clause environnementale

The 2 lots : 113 €k · 2 €k

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.