Skip to main content

Public contracts of Montpellier Méditerranée Métropole · 2022

Trx mur de soutènement restinclieres

€90k
maximum contract amount over 3 months — what was paid on it is not published
Signed on 16 September 2022 · ended around December 2022 · 3 months

Who won it

Le MarcoryTravaux de maçonnerie générale et gros œuvre de bâtiment · registered office Clermont-L'Herault (34800) · headcount 50 to 99 employees · SIREN 319607156

Number 170 by amount of the 249 contracts Montpellier Méditerranée Métropole published for 2022.

Other contracts of Le Marcory in Montpellier Méditerranée Métropole

Ecolotheque travaux de construction du bâtiment annexe de l’ecolotheque2024 · maximum over 15 months116€kTravaux de construction du bâtiment annexe de l’Ecolothèque2024 · maximum over 13 months116€kConstruction d’un poste de refoulement des eaux usées…2021 · maximum over 10 months458€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme et actualisable

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.