Skip to main content

Public contracts of Toulouse Métropole · 2023

Travaux d’assainissement d’eaux usées

Construction d’un poste de refoulement et de son réseau de transfert · Communes de blagnac et Toulouse · Sa/nf

€1.2M
maximum contract amount over 7 months — what was paid on it is not published
Signed on 15 May 2023 · ended around December 2023 · 7 months

Who won it

SubterraConstruction de réseaux pour fluides · registered office Portet-Sur-Garonne (31120) · headcount 20 to 49 employees · SIREN 481442762

The competition

3 bids received

Median for this procedure in 2023: 3 bids, across 158 comparable contracts. Procedure with negotiation · awarded to 1 company

Open data publishes the winner and the bid count — never the identity of unsuccessful bidders.

Number 30 by amount of the 162 contracts Toulouse Métropole published for 2023.

Other contracts of Subterra in Toulouse Métropole

Blagnac et Toulouse travaux dassainissement EU2023 · maximum over 10 months1.1€MTravaux d’assainissement2023 · maximum over 8 months519€kTravaux de réhabilitation des réseaux EU et EP sur le territoire de TM2022 · maximum over 5.5 years26.1€M
Contract details (procedure, price, amendments, lots)

Procedure : Procédure avec négociation

Price : Révisable

Published amendments : 1

Subcontracting declared : yes

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.