Skip to main content

Public contracts of Montigny-le-Bretonneux · 2023 · Construction and buildings

Gros oeuvre et corps d’état architecturaux

€44k
maximum contract amount over 12 months — what was paid on it is not published
Signed on 24 April 2023 · ended around April 2024 · 12 months

Company selected

Coopérative Moderne de ConstructionConstruction de maisons individuelles · registered office Drancy (93700) · headcount 10 to 19 employees · SIREN 430400499

Number 41 by amount of the 49 contracts Montigny-le-Bretonneux published for 2023.

Other contracts of Coopérative Moderne de Construction in Montigny-le-Bretonneux

Travaux de mise en accessibilité des écoles jules verne2023 · maximum over 7 months44€kMaçonnerie2021 · maximum over 3 years120€kTravaux de mise en accessibilité du groupe scolaire André Chénier2021 · maximum over 4 months71€k
Contract details (procedure, price, amendments, lots)

Procedure : Adapted procedure: the lighter procedure allowed under the EU thresholds

Price : Ferme

Published amendments : none

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.