Public contracts of Montigny-le-Bretonneux · 2023 · Construction and buildings

Travaux de mise en accessibilité des écoles jules verne

Gros œuvre / Corps d’état architecturaux

€44k
maximum contract amount over 7 months — what was paid on it is not published
Signed on 24 April 2023 · ended around November 2023 · 7 months

Company selected

Coopérative Moderne de ConstructionConstruction de maisons individuelles · registered office Drancy (93700) · headcount 10 to 19 employees · SIREN 430400499

The competition

5 bids received

awarded to 1 company

Open data gives the contract holder and the number of bids. The identity of unsuccessful bidders is not published.

Number 42 by amount of the 49 contracts Montigny-le-Bretonneux published for 2023. It belongs to the policy Schools.

Other contracts of Coopérative Moderne de Construction in Montigny-le-Bretonneux

Gros oeuvre et corps d’état architecturaux2023 · maximum over 12 months44€kMaçonnerie2021 · maximum over 3 years120€kTravaux de mise en accessibilité du groupe scolaire André Chénier2021 · maximum over 4 months71€k
Contract details (procedure, price, amendments, lots)

Price : Forfaitaire

Published amendments : none

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.