Skip to main content

Public contracts of Montigny-le-Bretonneux · 2021 · Construction and buildings

Travaux de mise en accessibilité du groupe scolaire André Chénier

GROS oeuvre corps d’etat architecturaux

€71k
maximum contract amount over 4 months — what was paid on it is not published
Signed on 31 May 2021 · ended around September 2021 · 4 months

Company selected

Coopérative Moderne de ConstructionConstruction de maisons individuelles · registered office Drancy (93700) · headcount 10 to 19 employees · SIREN 430400499

The competition

11 bids received

awarded to 1 company

Open data gives the contract holder and the number of bids. The identity of unsuccessful bidders is not published.

Number 19 by amount of the 33 contracts Montigny-le-Bretonneux published for 2021. It belongs to the policy Schools.

Other contracts of Coopérative Moderne de Construction in Montigny-le-Bretonneux

Gros oeuvre et corps d’état architecturaux2023 · maximum over 12 months44€kTravaux de mise en accessibilité des écoles jules verne2023 · maximum over 7 months44€kMaçonnerie2021 · maximum over 3 years120€k
Contract details (procedure, price, amendments, lots)

Price : Forfaitaire

Published amendments : 1

Subcontracting declared : no

Contracts above €40,000 excluding VAT, as declared when they are awarded (DECP): contract amounts, not payments. Smaller contracts are not published; obviously wrong amounts are set aside.