Sports centre Point du Jour, Mesnil Saint-Didier annex - Roof waterproofing repair
In 2022, the City of Paris budgeted €180k for "Sports centre Point du Jour, Mesnil Saint-Didier annex - Roof waterproofing repair" (, 16th arrondissement).
Source: City of Paris, localised investments in the administrative account, data as of 9 February 2026.
180k €
voted in the 2022 budget
Roof waterproofing repair at the Point du Jour leisure centre. Roof renovation to stop water leaks. The intervention protects the building and maintains the activities held there.
Cultural facility · Other
Contracts on this project
Matched automatically: check each contract’s purpose.
Acbc Travaux Etancheite des Bassins-plan D'eau-fontainesEtandex · 2022 · probable4€MTravaux Impermeabilisat°etancheite Carrelage Bassins/lot 6Snidaro · 2022 · confirmed2€MVentilation-system modernisation at Saint-Didier School in the 16th.La Louisiane · 2024 · confirmed945k €Etancheite Zone 2 Cour GS Eugenie Cotton 19eEtancheco · 2022 · confirmed666k €Other cultural facility projects · 2022
Sainte-Marie-Madeleine Church - Restoration of all facades8th3.3€MSaint-Eustache Church - Entrance facade restoration, miscellaneous works2.9€MSaint-Louis-en-l'Île Church - Roofs and facades1.4€MSaint-Gervais and Saint-Protais Church - Bell tower and north arm of the transept4th1.3€MArrondissement 16 · View on OpenStreetMap ↗
Amount voted, not final spending. Source: Administrative account appendix 2022 · page 48 ↗
