Terrace waterproofing works
In 2022, the City of Paris budgeted €155k for "Terrace waterproofing works" (, 18th arrondissement).
Source: City of Paris, localised investments in the administrative account, data as of 9 February 2026.
155k €
voted in the 2022 budget
Terrace waterproofing of a public building. Replacement of protective layers to stop rainwater leaks. A technical intervention to protect the lower floors from damp damage.
Other · Other
Contracts on this project
Matched automatically: check each contract’s purpose.
Travaux Impermeabilisat°etancheite Carrelage Bassins/lot 6Snidaro · 2022 · confirmed2€MEtancheite Toitures Terrasses EP Georges Balanchine 13e LOAttec · 2023 · confirmed447k €Controle de L’etancheite et du Terrassement lot 2Nextroad Engineering · 2021 · confirmed200k €Modernisation Etancheite Toiture Terrasse EE 3 Bornes 11EChapelec · 2023 · confirmed187k €Modernisat° Etancheite Terrasse du GS 132 RUE D'aubervillierBati Etanche Ile de France · 2020 · confirmed98k €Other other projects · 2022
La Trinité Church - Entrance facade restoration9th6.5€MRefugee centre19th5.5€MNotre-Dame d'Auteuil Church - Restoration of interior decor and stained glass16th1.3€MSainte-Anne de la Butte-aux-Cailles - Long-term consolidation13th1€MArrondissement 18 · View on OpenStreetMap ↗
Amount voted, not final spending. Source: Administrative account appendix 2022 · page 55 ↗
