Eiffel - Civil-engineering structures and walkway-network maintenance
In 2022, the City of Paris budgeted €227k for "Eiffel - Civil-engineering structures and walkway-network maintenance" (, 19th arrondissement).
Source: City of Paris, localised investments in the administrative account, data as of 9 February 2026.
Maintenance of bridges, footbridges and pedestrian paths in the Eiffel sector. Maintenance works on the civil-engineering structures and refurbishment of the walkway network. The aim is to maintain circulation quality and the strength of historic or technical structures.
Roads · Other
Contracts on this project
Matched automatically: check each contract’s purpose.
Diag Amiante et Plomb Ouvrages Espace Public VDP lot 1Marche Multiattributaire · 2022 · confirmed77.5€MTravaux Entretien Chaussees,trottoirs 11,19,20 arr. lot 3ENT. de Travaux Fayolle et Fils · 2022 · confirmed32€MReparat./remplact Réseaux Eaux Pluviales Ouvrages D'artTerideal · 2022 · confirmed2.4€MEntretien Réseaux EAU lot 3 : Cimetières ParisiensSte D Études Travaux Hydrauliques · 2022 · confirmed1€MTravaux Entretien par Cordes des Ouvrages ART ParisiensJarnias Travaux Speciaux · 2021 · confirmed400k €Other roads projects · 2022
Porte Maillot - Redevelopment17th7.1€MRue d'Aubervilliers - Éole-Évangile sector redesign19th1.2€MGaité Montparnasse block - Avenue du Maine roadway works14th1.1€MVarious streets - Beautify your neighbourhood Choisy13th1.1€MArrondissement 19 · View on OpenStreetMap ↗
Amount voted, not final spending. Source: Administrative account appendix 2022 · page 59 ↗
