Skip to main content
Qipu

Lake Merced

Lake / park

Lake Merced (lake / park, run by the Recreation and Park Department): $2.6M paid to contractors for work here, $250.4M budgeted for its department in FY2025, 2,161 employees on the payroll, 4 capital projects, 10 city documents at the Internet Archive, every figure linked to its source. Lake Merced's archive record is dominated by water and environmental studies. A 1999 watershed sanitary survey maps potential pollution sources; a 1998 baseline inventory catalogs the lake's soils, vegetation, wildlife and fisheries; a 1993 water-resource planning study and a 1990s groundwater master plan track its surface elevation and water levels; and a 1998 memorandum weighs alternatives to raise the lake, costed at $2,200,000, $8,200,000 and $3,900,000, alongside a 2001 Vista Grande diversion study. A 1973 waste-water master plan sites a large treatment plant at Lake Merced, and a 1965 annual report logs fishing-permit revenue and float repairs. Operated by the Recreation and Park Department, whose FY2025 budget line totals about $250M. Source: SF Controller open data and the Internet Archive.

Lake MercedWikimedia Commons · Isabell Schulz · CC BY 2.0
Grounded summary

Lake Merced's archive record is dominated by water and environmental studies. A 1999 watershed sanitary survey maps potential pollution sources; a 1998 baseline inventory catalogs the lake's soils, vegetation, wildlife and fisheries; a 1993 water-resource planning study and a 1990s groundwater master plan track its surface elevation and water levels; and a 1998 memorandum weighs alternatives to raise the lake, costed at $2,200,000, $8,200,000 and $3,900,000, alongside a 2001 Vista Grande diversion study. A 1973 waste-water master plan sites a large treatment plant at Lake Merced, and a 1965 annual report logs fishing-permit revenue and float repairs. Operated by the Recreation and Park Department, whose FY2025 budget line totals about $250M.

Built from: 10 archive documents, city budget data — no outside knowledge added.
$2.6M
paid to contractors for work here

1 Harding Rd · City-owned · 8,100 sq ft · 4 buildings on site · parcel 7283004 · District 7 · City Facilities registry

What public money did here
Paid to contractors for work here$2.6M
Treaty ConstructionFY2025$2.1M
Cazadoro Construction IncFY2024$583,807

What the City actually paid, across 2 contractors. Contractors big enough to have their own page are linked; the rest are named only.

Run by the Recreation & Parks, whose whole-department budget is $250.4M across 2,161 staff (FY2025) — citywide, not this place’s own. The City does not publish a running cost per building.

In the archive
See 6 more documents
Same kind