Hetch Hetchy / O'Shaughnessy Dam (reservoir / dam, run by the Public Utilities Commission): $28,749 paid to contractors for work here, $1.8B budgeted for its department in FY2025, 2,679 employees on the payroll, 29 contracts, 9 city documents at the Internet Archive, every figure linked to its source. The archive documents trace the O'Shaughnessy Dam and Hetch Hetchy system. A 2005 history records that San Francisco approved a "$45 million bond to build Hetch Hetchy System" in 1910, that the dam was built 1919-1923, and that it was later "raised to store 360,360 acre feet." A 1975-76 annual report of the Hetch Hetchy Water and Power System notes the dam was raised "an additional 85.5 feet," the system cost "some $100 million," and water reached Crystal Springs Reservoir in 1934. The system is operated by the Public Utilities Commission, whose FY2025 budget line is about $1.8B; a city contract for "Auto Parts for Hetch Hetchy" with Pine Mountain Auto Inc has been paid $28,748.78. Source: SF Controller open data and the Internet Archive.

Hetch Hetchy / O'Shaughnessy Damimg.freepik.com · Bing · UNVERIFIED
Grounded summary

The archive documents trace the O'Shaughnessy Dam and Hetch Hetchy system. A 2005 history records that San Francisco approved a "$45 million bond to build Hetch Hetchy System" in 1910, that the dam was built 1919-1923, and that it was later "raised to store 360,360 acre feet." A 1975-76 annual report of the Hetch Hetchy Water and Power System notes the dam was raised "an additional 85.5 feet," the system cost "some $100 million," and water reached Crystal Springs Reservoir in 1934. The system is operated by the Public Utilities Commission, whose FY2025 budget line is about $1.8B; a city contract for "Auto Parts for Hetch Hetchy" with Pine Mountain Auto Inc has been paid $28,748.78.

Built from: 9 archive documents, 29 contracts, city budget data — no outside knowledge added.
$28,749
paid to contractors for work here
What public money did here
Paid to contractors for work here$28,749
Pine Mountain Auto IncFY2025$28,749

What the City actually paid, across 1 contractor. Contractors big enough to have their own page are linked; the rest are named only.

The contracts that name this place29
Hetch Hetchy Power PurchaseofgasDEPARTMENT OF GENERAL SERVICES · PUC$47.6MHetch Hetchy Power-SFAC21.04 Gas PurchasePACIFIC GAS & ELECTRIC CO · PUC$29.1MHetch Hetchy Power PurchaseofsteamENERGY CENTER SAN FRANCISCO LLC · PUC$11.1MHetch Hetchy Power-SFAC21.04 Service ConnPACIFIC GAS & ELECTRIC CO · PUC$9.2M
+ 25 more contracts
Hetch Hetchy Water and Power NERC Cmpl Audit SprtARCHER ENERGY SOLUTIONS · PUC$8.2MHetch Hetchy Water and Power Power Transmission Line Clearance MIBLACK & VEATCH CORPORATION · PUC$7.5MHetch Hetchy Water and Power Tech Services SJPL ProgrmH D R ENGINEERING INC · PUC$5.7MAs-Needed Eng Services Hetch Hetchy Water and Power RRSTANTEC CONSULTING SERVICES INC · PUC$4.6MHetch Hetchy Power SunndaledevelopeSUNNYDALE DEVELOPMENT CO LLC · PUC$3.8MAs-Needed Eng Services Hetch Hetchy Water and Power RRMott MacDonald Group, Inc. · PUC$3.3MHetch Hetchy Power TiredevelopmentTreasure Island Series 1, LLC · PUC$2.9MHetch Hetchy Power PurchaseofpowermultiplPACIFIC GAS & ELECTRIC CO · PUC$1.9MHetch Hetchy Power Pier70-FY22FC Pier 70, LLC · PUC$1.7MHetch Hetchy Power Interconnection AgreePORT OF OAKLAND · PUC$1.5MHetch Hetchy Power Wapa Power BillWESTERN AREA POWER ADMINISTRATION DOE · PUC$1.4MHetch Hetchy Power CongestionrevenuerightsCALIFORNIA ISO · PUC$1.3MHetch Hetchy Water and Power Power Transmission Line Clearance MIBLACK & VEATCH CORPORATION · PUC$740,568Hetch Hetchy Power MissionrockredevelopmeMission Rock Horizontal Sub (Phase 1)LLC · PUC$608,877Hetch Hetchy Power CaisoCALIFORNIA ISO · PUC$382,567Hetch Hetchy Power Bridge Potrero FY26BRIDGE POTRERO COMMUNITY ASSOCIATES LLC · PUC$214,358Helicopter Services for Hetch Hetchy Water and PowerA & P HELICOPTERS INC · PUC$195,210Hetch Hetchy Power Biological&PhysicalENVIRONMENTAL SCIENCE ASSOCIATES INC · PRT$130,396Hetch Hetchy Power StreetlightsmaintenancSTATE OF CALIFORNIA / DEPT OF TRANSPORTA · PUC$62,113Hetch Hetchy Power WaterchargesEAST BAY MUNICIPAL UTILITIES DISTRICT · PUC$60,222Auto Parts for Hetch HetchyPine Mountain Auto Inc · ADM$28,74996104X PUC - Hetch Hetchy Power CopiersXEROX CORPORATION · PUC$20,64296104X Hetch Hetchy Water and Power-Xerox Rec / ControlXEROX CORPORATION · PUC$15,620As-Needed Eng Services Hetch Hetchy Water and Power RRKleinfelder and LEE Incorporated JV · PUCHetch Hetchy Power Mission Bay SolarSAN FRANCISCO UNIFIED SCHOOL DISTRICT · PUC

Every line opens that contract’s own page, with its spend curve and its subcontractors. Agreed amounts are ceilings, not spending.

Run by the Public Utilities Commission (water, power, sewer), whose whole-department budget is $1.8B across 2,679 staff (FY2025) — citywide, not this place’s own. The City does not publish a running cost per building.

In the archive
See 5 more documents