Skip to main content
Qipu

Sunset Reservoir

Reservoir

Sunset Reservoir (reservoir, run by the Public Utilities Commission): $1.8B budgeted for its department in FY2025, 2,679 employees on the payroll, 8 city documents at the Internet Archive, every figure linked to its source. Sunset Reservoir is the western end of the city's water system, and its record runs from construction to a public quarrel about how it was planned. The Public Utilities Commission's report on the 1933 bond issue lists "Sunset Reservoir and Connecting Pipes" among the contracts let under Public Works Administration Docket 1510, and the history of the municipal water department traces the twenty-mile Sunset Pipeline, of 78- and 60-inch pipe, running through the Lake Merced Pumping Station to feed it. A 1957-58 water department report puts numbers to that: the Lake Merced pumps boosted an average of 24.8 million gallons a day off the Sunset Pipeline, 16.0 million of it to this reservoir and 8.8 million to Sutro. A 1979 environmental report for San Andreas Pipeline No. 3 proposed running a 66-inch main 62,200 feet from the filtration plant at Millbrae to the reservoir, partly because flows here were being reduced at peak demand by suburban users drawing on existing transmission capacity. By 2001 the commission's own capital programme was recording the North Basin's 1938 roof, its significant concrete expansion and its circulation problems. And when the Public Utilities Infrastructure Task Force reviewed a sample of the city's capital projects, it picked two — the Calaveras Dam and this reservoir — and concluded of the North Basin embankment, foundation stabilisation and seismic upgrade that the project "was not sensibly planned". Source: SF Controller open data and the Internet Archive.

Sunset Reservoirlive.staticflickr.com · Bing · UNVERIFIED
Grounded summary

Sunset Reservoir is the western end of the city's water system, and its record runs from construction to a public quarrel about how it was planned. The Public Utilities Commission's report on the 1933 bond issue lists "Sunset Reservoir and Connecting Pipes" among the contracts let under Public Works Administration Docket 1510, and the history of the municipal water department traces the twenty-mile Sunset Pipeline, of 78- and 60-inch pipe, running through the Lake Merced Pumping Station to feed it. A 1957-58 water department report puts numbers to that: the Lake Merced pumps boosted an average of 24.8 million gallons a day off the Sunset Pipeline, 16.0 million of it to this reservoir and 8.8 million to Sutro. A 1979 environmental report for San Andreas Pipeline No. 3 proposed running a 66-inch main 62,200 feet from the filtration plant at Millbrae to the reservoir, partly because flows here were being reduced at peak demand by suburban users drawing on existing transmission capacity. By 2001 the commission's own capital programme was recording the North Basin's 1938 roof, its significant concrete expansion and its circulation problems. And when the Public Utilities Infrastructure Task Force reviewed a sample of the city's capital projects, it picked two — the Calaveras Dam and this reservoir — and concluded of the North Basin embankment, foundation stabilisation and seismic upgrade that the project "was not sensibly planned".

Built from: 8 archive documents, city budget data — no outside knowledge added.

1949 24th Ave · City-owned · parcel 2107001 · District 4 · City Facilities registry

What public money did here

No city spending is recorded against this place by name. San Francisco publishes contracts, bond items and vendor payments at project level, and none of them names this site — so there is no figure to show, rather than a figure of zero.

Run by the Public Utilities Commission (water, power, sewer), whose whole-department budget is $1.8B across 2,679 staff (FY2025) — citywide, not this place’s own. The City does not publish a running cost per building.

In the archive
See 4 more documents
Same kind